Rectory in Original Location

Monday, July 11, 2011

Tranquility stops at the front door!

From the outside, the rectory looks as though it is just another day, but on the inside change is rapidly occuring as Jim Kammerer, Premier Construction Company, prepares the building for the move.  First item of the day was to disconnect the utilities.  While that was going on, Jim and his right hand man TJ opened up the drop ceiling in the addition to determine where the structural support for the second floor is.  The rectory addition was built around a stone garage.  These interior stone walls must come down before the house and addition can be moved.  Will this inner turmoil eventually lead to peace within?